Rooftop Solar in Meerut — Installation, Subsidy & Cost
Solaroof designs, installs and maintains rooftop solar power plants across Meerut. MNRE-approved modules, government subsidy assistance under PM Surya Ghar Muft Bijli Yojana, net metering support and verified local installation teams — for homes, housing societies, shops, offices, schools, warehouses and factories.
- Free site survey & shadow analysis
- Subsidy paperwork done for you
- Net metering with your local discom
- 5-year workmanship warranty



Why Meerut chooses Solaroof for rooftop solar
Electricity tariffs in Uttar Pradesh keep climbing, and rooftops sit unused. A grid-connected solar plant turns that roof into a 25-year asset: it offsets your monthly bill, exports surplus units to the grid through net metering, and pays for itself in roughly three to four years. Our Meerut team handles structure design for local wind loads, safe cable routing, earthing and lightning protection, and the discom liaison work most homeowners dread.
MNRE-approved equipment
Tier-1 panels and inverters approved for subsidy claims in Uttar Pradesh.
Verified local installers
Background-checked crews who work in Meerut every week.
Transparent pricing
Itemised quote — panels, inverter, structure, cabling, labour, net meter.
After-sales AMC
Cleaning, monitoring and repairs available across Meerut.
Solar services we offer in Meerut
Residential Solar Installation in Meerut
1 kW to 20 kW on-grid systems for homes, villas and apartments, with subsidy assistance.
Learn moreCommercial Solar Installation in Meerut
Shops, offices, hotels, schools and hospitals — cut operating costs by up to 80%.
Learn moreIndustrial Solar in Meerut
Factory sheds and warehouses from 50 kW to 1 MW+, with accelerated depreciation.
Learn moreOn-grid, Off-grid & Hybrid
Net-metered on-grid, battery-backed hybrid, or fully off-grid for low-supply areas.
Learn moreSolar AMC, Cleaning & Repair
Panel cleaning, inverter service, generation audits and fault repair.
Learn moreSubsidy & Net Metering
PM Surya Ghar registration, discom application and net-meter installation.
Learn moreSolar panel price in Meerut (2026 indicative)
Prices below are indicative turnkey costs for Meerut including panels, inverter, mounting structure, cabling, installation and net-metering support. Final pricing depends on roof type, structure height and brand selection.
| System size | Typical generation | Indicative cost | Subsidy benefit |
|---|---|---|---|
| 1 kW | ~120 units/month | ₹65,000 – ₹75,000 | ₹30,000 |
| 2 kW | ~240 units/month | ₹1.15L – ₹1.30L | ₹60,000 |
| 3 kW | ~360 units/month | ₹1.65L – ₹1.85L | ₹78,000 |
| 5 kW | ~600 units/month | ₹2.60L – ₹3.00L | ₹78,000 |
| 10 kW | ~1,200 units/month | ₹5.20L – ₹6.00L | ₹78,000 |
| 20 kW | ~2,400 units/month | ₹9.80L – ₹11.5L | Accelerated depreciation |
| 50 kW | ~6,000 units/month | ₹23L – ₹28L | Accelerated depreciation |
| 100 kW | ~12,000 units/month | ₹45L – ₹55L | Accelerated depreciation |
PM Surya Ghar subsidy in Uttar Pradesh
Uttar Pradesh offers an additional state subsidy on top of the PM Surya Ghar central subsidy of up to ₹78,000, making UP one of the most affordable states for rooftop solar. Net metering via UPPCL discoms.
Up to 2 kW
₹30,000 per kW central subsidy
3 kW
₹78,000 total subsidy (maximum)
Above 3 kW
Subsidy capped at ₹78,000; balance financed via solar EMI
How rooftop solar installation works in Meerut
- 1
Free site survey
Our Meerut engineer measures usable roof area, checks shadows and studies your last 6 electricity bills.
- 2
System design & quote
You receive a shadow-analysis based layout, generation estimate, payback period and an itemised quote.
- 3
Subsidy & discom application
We register your PM Surya Ghar application and file the net-metering request with your discom.
- 4
Installation
Galvanised structure, module mounting, DC/AC cabling, earthing and lightning arrester — completed in 2–4 days.
- 5
Net meter & commissioning
Discom inspection, bi-directional meter installation and commissioning certificate.
- 6
Monitoring & AMC
App-based generation monitoring plus scheduled cleaning and maintenance visits.
Recent solar projects near Meerut

9 kW residential rooftop
Bahadurgarh, Haryana — on-grid with net metering

40 kW commercial plant
Bahadurgarh — factory rooftop, accelerated depreciation

10 kW home system
Jaipur, Rajasthan — elevated structure over terrace
Our service area in Meerut
Solar in Meerut: local grid, tariff and site conditions
Electricity distribution company
UPPCL discoms — PVVNL (West UP), NPCL (Greater Noida), MVVNL, PuVVNL and DVVNL
Local electricity tariff
₹3.35–₹6.50 per unit for domestic supply and ₹7.50–₹9.00 per unit for commercial connections
Sunlight & weather
Western UP averages 5.0–5.4 peak sun hours a day; monsoon months lower output slightly and are offset by net-metering banking
Installation timeline
2–4 days of installation, with UPPCL/NPCL net metering typically approved in 3–6 weeks
Solaroof teams regularly install rooftop solar around Noida Sector 62, Greater Noida Alpha, Ghaziabad Indirapuram, Meerut Delhi Road and Lucknow Gomti Nagar in Meerut, so structure design, crane access and discom coordination are already mapped for these areas.
Quick answers about solar in Meerut
What is the best solar company in Meerut?
Solaroof is among the most trusted rooftop solar companies in Meerut. We handle site survey, design, MNRE-approved equipment, installation, UPPCL discoms — PVVNL (West UP), NPCL (Greater Noida), MVVNL, PuVVNL net metering and PM Surya Ghar subsidy paperwork in one contract, backed by a 5-year workmanship warranty and 25-year panel performance warranty.
How much does rooftop solar cost in Meerut?
A 3 kW rooftop solar system in Meerut costs about ₹1.65–1.85 lakh, a 5 kW system ₹2.60–3.00 lakh and a 10 kW system ₹5.20–6.00 lakh, installed. After the PM Surya Ghar subsidy of up to ₹78,000, most homes recover the cost in three to four years.
How much subsidy is available under PM Surya Ghar in Uttar Pradesh?
Households in Uttar Pradesh get ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for systems of 3 kW and above. Solaroof files the portal application, net-metering request and commissioning report free of charge.
How long does solar installation take in Meerut?
Installation in Meerut takes 2–4 days of installation, with UPPCL/NPCL net metering typically approved in 3–6 weeks. Most homes are generating power within the first week and fully net-metered inside a month.
Comparing rooftop solar brands in Meerut
Homeowners in Meerut usually shortlist national brands such as Tata Power Solar, Waaree, Adani and Loom Solar alongside local EPC companies. Solaroof is an independent solar EPC company and is not affiliated with any of them — we install Tier-1 MNRE-approved modules from multiple manufacturers and quote them side by side. See the full Tata Solar Roof vs Solaroof comparison.
Solar FAQs for Meerut
Which is the best solar company in Meerut?
Solaroof is a trusted rooftop solar company serving Meerut with MNRE-approved panels, in-house installation crews and verified local vendor partners. We handle site survey, design, structure, installation, net metering and subsidy paperwork end to end, and every system carries a 5-year workmanship warranty with 25-year panel performance warranty.
How much does a rooftop solar system cost in Meerut?
In Meerut, a 3 kW residential rooftop system typically costs ₹1.65–1.85 lakh before subsidy, a 5 kW system ₹2.60–3.00 lakh and a 10 kW system ₹5.20–6.00 lakh. After the PM Surya Ghar Muft Bijli Yojana subsidy of up to ₹78,000, most homes recover their investment in 3–4 years.
How much does a 5 kW solar system cost in Meerut?
A 5 kW on-grid system in Meerut costs roughly ₹2.60–3.00 lakh installed with Tier-1 modules, a string inverter, galvanised structure, cabling, earthing and net-metering support. With the ₹78,000 central subsidy the net outgo drops to about ₹1.85–2.25 lakh.
How many solar panels do I need for a ₹5,000 electricity bill in Meerut?
A ₹5,000 monthly bill in Meerut usually means 600–750 units a month, which needs roughly a 5 kW system — about 9 to 11 panels of 545–575 Wp — and around 350–400 sq ft of shadow-free roof.
What subsidy is available for solar in Uttar Pradesh?
Uttar Pradesh offers an additional state subsidy on top of the PM Surya Ghar central subsidy of up to ₹78,000, making UP one of the most affordable states for rooftop solar. Net metering via UPPCL discoms.
Which discom handles net metering in Meerut?
Net metering in Meerut is processed through UPPCL discoms — PVVNL (West UP), NPCL (Greater Noida), MVVNL, PuVVNL and DVVNL. Solaroof files the application, coordinates the feasibility inspection and gets the bi-directional meter installed on your behalf.
How long does solar installation take in Meerut?
A standard residential installation in Meerut takes 2–4 days of installation, with UPPCL/NPCL net metering typically approved in 3–6 weeks. Including discom application, net-metering approval and subsidy disbursal, the full process usually completes in 3–5 weeks.
What is the electricity tariff in Meerut and how much can solar save?
Tariffs in Uttar Pradesh run about ₹3.35–₹6.50 per unit for domestic supply and ₹7.50–₹9.00 per unit for commercial connections. A correctly sized rooftop system offsets 80–95% of that bill, and exported units are banked against night-time consumption through net metering.
Do you provide maintenance and AMC in Meerut?
Yes. We offer scheduled panel cleaning, inverter health checks, generation monitoring and annual maintenance contracts (AMC) for every system we install in Meerut, plus paid AMC for systems installed by other companies.
Is the weather in Meerut suitable for solar?
Western UP averages 5.0–5.4 peak sun hours a day; monsoon months lower output slightly and are offset by net-metering banking. Modules are warrantied to hold at least 80% output at year 25, so seasonal variation is factored into every generation estimate we share.
Do you serve commercial and industrial rooftops in Meerut?
Yes. Alongside homes we build commercial and industrial rooftop plants in Meerut from 20 kW to 1 MW+, including factory sheds, warehouses, schools, hospitals and hotels — with accelerated depreciation benefits and open-access advisory.
How do I apply for PM Surya Ghar in Meerut?
Register on the national PM Surya Ghar portal with your electricity consumer number, choose a registered vendor, get the system installed, apply for net metering and upload the commissioning certificate. The subsidy is credited directly to your bank account, usually within 30 days. Our team completes this paperwork for you free of charge.
Can I install solar on a rented or shared rooftop in Meerut?
Yes, with the owner's written consent and the electricity connection in the applicant's name. For housing societies in Meerut we design shared plants with sub-metering so each flat is credited for its share of generation.
What warranty do you provide in Meerut?
Panels carry a 25-year performance warranty and 10–12 year product warranty, inverters 5–10 years depending on brand, mounting structure 10 years against corrosion, and Solaroof adds a 5-year workmanship warranty on every installation in Meerut.
Do you offer EMI or financing for solar in Meerut?
Yes. Rooftop solar is covered under RBI priority-sector lending, so most nationalised banks in Meerut offer 5–10 year loans at 7–10% interest. We share the documentation checklist and coordinate with your bank during the quote stage.
Do you have completed projects near Meerut?
Yes — recent Solaroof projects near Meerut include a 9 kW residential rooftop in Bahadurgarh, a 40 kW factory plant in the Bahadurgarh industrial belt and 10 kW elevated home systems in Jaipur. We can share reference contacts during the site survey.
Other solar service areas in Uttar Pradesh
Get your free solar quote in Meerut
Free site survey, subsidy assistance and transparent pricing.